PAL Jaya Starts to Install Communal IPAL in Kemayoran
access_time August 30 2019 05:03 PM remove_red_eye 1020
Reported by Wuri Setyaningsih | Translated by Nugroho Adibrata
Reported by Wuri Setyaningsih | Translated by Nugroho Adibrata
We use the mini excavator that has been deployed to the location
The construction of the 21 communal mini wastewater treatment plants (IPAL) has been undergoing on Jalan Serdang I, Gg III, RT 06/RW 05, Serdang, Kemayoran, Central Jakarta, on Friday (8/30).
PD PAL Jaya Engineering and Business Director, Erwin Marphy Ali said that the work would be done at six locations to serve domestic wastewater treatment.PAL Jaya Continues to Socialize Communal IPAL Maintenance
"We use the mini excavator that has been deployed to the location. One unit has 2.5 meters length with 1.2 meters width and 1.5 meters depth," he expressed.
This is expected to last for the next month.
Kemayoran Sub-district Head, Asep Mulyaman asserted his side would support PD PAL Jaya to smoothen the work, including its security.
"If it is needed, we will send RW to the location. All this time we have always done socialization to the public," he stated.
Linked News
-
Dike Construction for IPAL in Panggang Island Enters Finishing Stage
access_timeSelasa, 28 Mei 2019 14:31 WIB
remove_red_eye1538 personSuparni -
This Year, Communal IPAL to Be Built in Ciracas
access_timeSelasa, 29 Januari 2019 13:42 WIB
remove_red_eye1030 personNurito -
Homes on Tidung Island Connected with IPAL
access_timeSenin, 28 Januari 2019 15:35 WIB
remove_red_eye1182 personSuparni
Popular News
indeks